RESEARCH ARTICLE


Design and Analysis of a Concrete Placer for Optimize the Craft of Infilled Walls’S Constructional Column



Xiaosheng Song*, 1, Shuo Wang2, Xiaosheng Song3
1 Hebei United University, Earthquake Engineering Research Center of Hebei Province, Tangshan, Hebei, China, 063009
2 Hebei United University, Earthquake Engineering Research Center of Hebei Province, Tangshan, Hebei, China, 063009
3 Hebei United University, Earthquake Engineering Research Center of Hebei Province, Tangshan, He-bei, China, 063009


Article Metrics

CrossRef Citations:
0
Total Statistics:

Full-Text HTML Views: 320
Abstract HTML Views: 302
PDF Downloads: 245
Total Views/Downloads: 867
Unique Statistics:

Full-Text HTML Views: 219
Abstract HTML Views: 212
PDF Downloads: 214
Total Views/Downloads: 645



Creative Commons License
© 2015 Song et al;

open-access license: This is an open access article distributed under the terms of the Creative Commons Attribution 4.0 International Public License (CC-BY 4.0), a copy of which is available at: https://creativecommons.org/licenses/by/4.0/legalcode. This license permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.



Abstract

Aiming at the construction of infill wall structural column are often used in artificial layer pouring method and top pouring back method, to improve the structure of wall column concrete pouring process, puts forward a new type of structural column concrete pouring machine. The application of this equipment, process worker can finish pouring filled wall structure column and tap filled wall structure column and unloading modulus. Reduces the labor intensity, reduces the construction cost and ensure the construction quality of frame pillar structure, realizes the structural column placement by artificial into mechanization. Introduces the design concept and the design of machinery equipment. Put forward a kind of "mixed Vibration, Lifting and Transmission" design concept. The mechanical design including a pumping device, transmission device, track lifting device, transmission device, vibration device, supporting steel template module six. Describes the structure and function of the main components of the. Describes the use of the method and the working principle of the equipment. And correlation analysis and calculation on the key parts. Presents the control principle and control calculation. Through the 3D MAX animation simulation and real structures is feasible

Keywords: Concrete pouring machine, ınfill wall structural column, mechanical design, the development of ideas.