Cases | Blasting scheme | Advantages | Disadvantages |
---|---|---|---|
The past cases | Blasting demolished separately one by one | Low risk, don’t consider the interaction among the various architecture structures. | Low efficiency, construction period extended. |
The present case | Blasting demolished in the same time | High efficiency, construction period shortened. | High risk, the collapse sequence, direction, scope of the dismantled building must be accurately controlled. |