Table 4: Problems in the process of claim identification.

Rank R.I. Problems
1 0.70 Lack of awareness of the on-site people
2 0.67 On-site people have inadequate knowledge of the contract
3 0.63 Lack of skilled personnel
4 0.57 Inaccessibility of documents used to identify a claim
5 0.52 Difficulty in detecting any problems during work due to high workload
6 0.49 Inadequate time
7 0.48 Unclear responsibility to detect a claim
8 0.47 Unclear procedures in recognizing a claim
9 0.46 Poor communication between sites and head office

Wclaim = 0.550 Wvalue = 0.743 (significant at 1% level)