Factors |
Source |
Project type |
Elbeltagi et al. (2014) [6], Irfan et al. (2011) [7] |
Contract type |
Irfan et al. (2011) [7], El-kholy (2015) [8], WSDOT (2015) [9] |
Area location |
Liu et al. (2010) [10], Williams and Songer (2008) [12] |
Project location (districts) |
Elbeltagi et al. (2014) [6], Gardner et al. (2017) [13], Gransberg et al. (2017) [14], Gardner et al. (2016) [15], Kaleem et al. (2014) [5] |
Project scope |
Elbeltagi et al. (2014) [6], [El-Maaty et al. (2017) [16], Barraza et al. (2017) [17] |
Project length |
Elbeltagi et al. (2014) [6], Liu et al. (2010) [10], Gardner et al. (2017) [13], Naik and Radhika (2015) [18], Mahamid (2011) [19], Mahamid (2017) [20] |
Site topography (Terrain type) |
Mahamid (2017) [20], WSDOT (2015) [9], Gardner et al. (2017) [13], Aziz and Abdelhakam (2016) [21], Gransberg et al. (2017) [14] |
Project capacity (Number of lanes) |
Elbeltagi et al. (2014) [6], Attal (2010) [11] |
Design AADT |
Williams and Songer (2008) [12], Attal (2010) [11], Gransberg et al. (2017) [14] |
Design speed |
Williams and Songer (2008) [12], Attal (2010) [11], Gransberg et al. (2017) [14] |
Geometric design standard |
Williams and Songer (2008) [12], Attal (2010) [11], Gransberg et al. (2017) [14] |
Curb, gutter and sidewalk |
Gransberg et al. (2017) [14], Williams and Songer (2008) [12] |
Waterbody and storm drain extents |
Elbeltagi et al. (2014) [6], Gardner et al. (2017) [13] |
Right-of-way (ROW) costs |
Gransberg et al. (2017) [14], Aleithawe et al. (2012) [22] |
Climate / weather conditions |
Rivera et al. (2017) [2], Akal et al. (2017) [23], [Barraza et al. (2017) [17], Ren et al. (2008) [24], Bagaya and Song (2016) [25] |
Condition / type of soils |
Elbeltagi et al. (2014) [6], Gardner et al. (2017) [13] |
Contractor’s performance |
Santoso and Soeng (2016) [26], WSDOT (2015) [9], Doloi et al. (2012) [27], Sambasivan and Soon (2007) [28] |
Construction letting date |
Gransberg et al. (2017) [14] |
Financial condition and rate of inflation |
Akal et al. (2017) [23] |
Construction project cost/amount |
Attal (2010) [11], Naik and Radhika (2015) [18] |