Table 16: Priority weights and ranking of factor dimensions and factors.

Factor Dimensions Weight Rank Factors Local Weight Local Rank Global Weight Global Rank
F1 0.2229 2nd Bridge type & complexity (F11)
Number of bridges (F12)
0.631
0.369
1st
2nd
0.1406
0.0823
3rd
5th
F2 0.0453 4th Weather condition (F21)
Contractor's experience (F22)
ROW costs (F23)
0.387
0.470
0.143
2nd
1st
3rd
0.0175
0.0213
0.0065
9th
7th
10th
F3 0.5914 1st Project complexity (F31)
Project type (F32)
Project size (F33)
0.539
0.000
0.461
1st
3rd
2nd
0.3188
0.0000
0.2726
1st
11th
2nd
F4 0.1405 3rd Soil type (41)
Site topography (F42)
Total project cost (F43)
0.144
0.679
0.177
3rd
1st
3rd
0.0202
0.0954
0.0249
8th
4th
6th
F5 0.000 5th Project area location (F51) 0.000 1st 0.000 11th