Table 4: The impact of inadequate H&S interventions on project parameters.

No. Project Parameter Mean Std. Dev. RII (%) T Value P Value
Sig.
Rank
A1 Labour productivity 3.71 0.78 74.29 8.08 0.000* 2
A2 Project schedule 3.42 0.94 68.31 3.89 0.000* 4
A3 Quality 3.91 0.88 78.18 9.10 0.000* 1
A4 Cost of construction 3.40 0.95 68.05 3.72 0.000* 5
A5 Client satisfaction 3.62 0.99 72.47 5.54 0.000* 3
All the items 3.61 0.62 72.26 8.64 0.000*