Table 4: Design efficiency of the dry iron B.

Name of Assembly C1 C2 C3 C4 C5 C6 C7 C8
Total angle of symmetry (α +β), deg (°) Number of times the operation is carried out consecutively Two-digit manual handling code Manual handling time per part (s) Two-digit manual insertion code Manual insertion time per part (s) Total Operation time, seconds (s) Figure for estimation of theoretical minimum parts
1. Casing 720 1 30 1.95 17 9.0 10.95 1
2. Knob 360 1 10 1.50 01 2.5 4.00 1
3. Signal Lamp Cover 720 1 70 5.10 02 2.5 7.60 1
4. Handle 720 1 30 1.95 06 5.5 5.45 0
5. Vertical Cord Lift 720 1 20 1.80 01 2.5 4.30 0
6. Thermostat 720 1 83 5.60 16 8.0 13.6 1
7. Sole Plate 0 1 00 1.13 00 1.5 2.63 1
8. Sole Plate Cover 720 1 30 1.95 13 6.0 7.95 1
9. Screw A 360 5 11 1.80 39 8.0 49.0 0
10. Screw B 360 7 11 1.80 39 8.0 68.6 0
Design Efficiency = 3(6)174.08=0.1034 (10.34%) TM NM
174.08 6