Fig. (11) Estimated TOC values from GR, RHOB, and DT are cross-plotted against TOC measurements from Rock-Eval. This TOC estimation method is best estimating so far as the trend line has highest correlation (highest R2), line slope closest to one, and y-intercept closest to zero.