Table 5: Computing results of JS 25 transportation pipe (3.5 MPa, 6A×104m3/d).

Water-gas ratio/(×10-4) P1/(kPa) P2/(kPa) T1/(°C) T2/(°C) Hydrop content/(m3)
0 3510.87 3500 18 8.72 0
0.2 3772.92 3500 18 8.16 1.418
0.5 3907.24 3500 18 7.96 2.2
1 4051.96 3500 18 7.69 3.072
1.5 4158.99 3500 18 7.57 3.654
7 4598.39 3500 18 7.5 4.637