Table C: Check computation of gas-liquid conveying distance for low-pressure pipe network in Xinchang area.

Delivering volume Conveying distance/(m) Network pressure Initial pressure/(MPa) Pressure loss
(×104m3/d) (MPa) (MPa)
0.1 10000 0.7 0.7039 0.0039
0.5 10000 0.7 0.7638 0.0638
0.8 10000 0.7 0.8719 0.1719
1 10000 0.7 0.9504 0.2504
1.5 10000 0.7 1.1809 0.4809
2 5700 0.7 1.1807 0.4807
3 2500 0.7 1.1821 0.4821
4 1200 0.7 1.1712 0.4712
5 850 0.7 1.1839 0.4839
6 550 0.7 1.1732 0.4732