Table 1:
Expected total costs of each alternative (million $ / year).
Cost Elements
Route 1 (233.6 km)
Route 2 (233.6 km)
Construction Costs
$6,247.9M
$6,251.5M
Operation Costs
$422.1M
$422.1M
Ecological Costs
$5.3M
$5.1M
Total Costs
$6,675M
$6,679M
Difference
-
+$3.3M