Table 16: Range of stability of the weights.

Sr. No. Criteria Lower Bound Upper Bound
1 Construction cost (103, US dollar) 0.80 9.14
2 Maintenance cost (103, US dollar/year) 2.55 12.54
3 Vehicle operation cost saving (103, US dollar/year) 0.00 7.31
4 Travel time saving cost (103, US dollar) 0.00 6.58
5 Accidents cost (103, US dollar) 6.62 19.32
6 Pollution cost (103, US dollars) 1.98 9.74
7 Population served per km (Nos.) 0.00 14.98
8 Access to educational services (Nos. of students) 4.13 22.64
9 Access to other services (Nos.) 6.72 13.24
10 Road as a community priority (5-point scale) 0.00 100.00
11 Encroachment on historical areas (9-point scale) 0.00 100.00
12 Possibility of landslide or flooding (9-point scale) 0.00 100.00
13 Impacts on natural systems (9-point scale) 8.70 16.65